Items |
Units |
Parameters |
|||
|
|||||
Max. theo. concrete output (L./H.) |
m3/h |
88/57 |
|
||
Max.concrete pumping pressure (H./L.) |
MPa |
18/11 |
|
||
Distribution valve type |
|
S Valve |
|
||
Concrete cylinder diameter×stroke |
mm |
Ф200×1600 |
|
||
Hopper capacity |
cbm |
0.8cbm |
|
||
Outlet diameter |
mm |
Ф180 |
|
||
Diesel engine model |
|
Dongfeng Cummins |
|
||
Diesel engineering power |
kW |
176kw |
|
||
Circuit type |
|
Open circuit |
|
||
Main oil cylinder |
mm |
Φ150*1600 |
|
||
Capacity of oil tank |
L |
500 |
|
||
The theory transportation distance vertically /Level |
m |
350/1500 |
|||
Max. aggregate diameter |
mm |
Scree: 40 |
|
||
Inside diameter of delivering pipe |
mm |
Ф125 |
|
||
Dimensions:length×width×height |
mm |
6300*2100*2350 |
|
||
Total weight |
kg |
6900 |
|
1. Concrete pump is a kind of economic pump for middle and small project,such as road building, house building, bridges and so on.
2. For 1000 square meters(10763 square feet),with 10cm thickness concrete floor: Just need 2 hours can be finished pump.
3. One person operation.
4. With diesel generator, not limited by electricity.
|
|
Diesel Engine 129kw Diesel engine Stable quality Long usage lift. |
|
|
Pump hopper 600L feeding capacity Contain mixing shaft inside hopper, keep mixing concrete again inside pump hopper. |
|
|
Main oil pump KAWASAKI oil pump. |
|
|
Gear pump Double gear pump, one for cooling, one for drive mixing shaft of pump hopper. |
|
|
Control box Schneider electric part, Omron PLC unit. |
|
|
Traction system Equip wheel for movable Design Jack system at the Traction part, when work, Pack up wheel, let support leg on f so that Protect wheel. |
|
|
Pipe and connector Send 150m pipe and connector as now. |